With a new SNCF order for 40 TGV 2N2 and ongoing order for 12 for Marocco Alstom deceided to change the end of the TGV assembly line to a moving system concept. It is less time consuming than crane operation and much safer. Assembly rate is two powered heads (one trainset) per month until 2019. |