Title: |
Visit to Alstom factory in France |
Description: |
With a new SNCF order for 40 TGV 2N2 and ongoing order for 12 for Marocco Alstom deceided to change the end of the TGV assembly line to a moving system concept. It is less time consuming than crane operation and much safer. Assembly rate is two powered heads (one trainset) per month until 2019. |
Photo Date: |
10/9/2013 Upload Date: 1/3/2014 4:18:19 AM |
Location: |
Belfort, FR |
Author: |
Peider SwissTrip |
Categories: |
|
Locomotives: |
SNCF TGV2N2(UNKNOWN) |
Views: |
290 Comments: 1 |