CB&Q F3 132A westbound at Naperville, Illinois on August 3, 1965, photo by Chuck Zeiler. Built on EMD Order E957 during November 1948 (c/n 7050), it was traded as credit for a GP40 in January 1967. Order E957 was for 17 A/B/B/A F3 sets, and the delivery spanned three Phases of F3 production. Sets 122-125, delivered in April 1948 were Phase II F3's equipped with the new 36 inch unshrouded cooling fans. Sets 126-129 (Phase III) had louvers between the side porthole windows and lacked the "chicken wire". Sets 130-138 introduced the stainless steel Farr Air grills at the top side of the carbody, making the Phase IV F3's look much like a Phase I F7, except for the rectangular openings on the roof for the dynamic brakes instead of a 36 inch fan. |