NS yard job E19 starts back up the hill with four cars received from CSX. CSX signal and bungalows for the switch for the "switching lead" to Main 1 to the right.         
This is the Southern Ry's "Old Main Line" which pulls a stiff grade leaving the James River Valley. Southern built a cut-off around downtown Lynchburg, opening on March 1, 1911.
Date: 5/6/2023 Location: Lynchburg, VA Views: 63 Collection Of:   G. R. Harper
Locomotives: NS 7536(ES40DC)    Author:  G. R. Harper
NS yard job E19 starts back up the hill with four cars received from CSX.  CSX signal and bungalows for the switch for the "switching lead" to Main 1 to the right.
Picture Categories: This picture is part of album:  More downtown Lynchburg riverfront action
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=6018067