Empty gypsum train W289 sits on the Sequatchie Valley wye at Bridgeport. The train was delivered to the Sequatchie Valley the previous day and was unloaded at US Gypsum's plant between Bridgeport and South Pittsburg, TN. A CSX crew will arrive later in the day to take the empties back to Stillesboro, GA. |