Short-Lived Cantilever         
Glenfield's 8.9 signal had short service life. It was put up about 5 years ago after the PRR Bridge was accidentally toppled by track construction work. It along with 10.7 and 6.5 came down on September 29th, 2019
Date: 4/25/2018 Location: Glenfield, PA Views: 124 Collection Of:   Richard Koehler
Author:  Richard Koehler
Short-Lived Cantilever
Picture Categories: Signal This picture is part of album:  The Late Great Eclectic Signals of The Fort Wayne Line
Share
User Comments
Name Type Comments Date

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5200443