The bridge tender offers a friendly wave to the crew of a CN through freight crossing the bascule bridge over the Fox River as it heads northeast via former C&NW rails at Oshkosh, WI on 23 Jul. '17. The bridge was completed in Aug. '13 to replace the 1899 swing bridge. |