CN through freight passes the former C&NW depot and parallels Broad St. as it heads south at Oshkosh, WI on"19 Mar. '17. Train had three locomotives, led by IC 1037 and CN 2019. Built by the Chicago firm of Clark & Fuller in 1884 on Broad St. between Washington Ave. ahd Merritt Avk. at a cost $15,000, it opened on 1 Dec. ’84. The last passenger train, the Peninsula “400,” departed on 31 Jun. ’71. Currently used by Clarity Care. |