Using measuring tape existing main line is tapped into proper alignment. Final portion of second main will be put down in a matter of days. It currently ends out of sight around the curve
When complete NS will have an unbroken stretch of double track from CP Deal (MP 190.0) to CP White (MP 222.0) which will help to eliminate a traffic bottleneck that exists south of the "Hurt Connection"
Date:
1/30/2017
Location:
Smothers, VA
Views:
200
Collection Of:
G. R. Harper
Author:
G. R. Harper
Picture Categories:
This picture is part of album:
Elimination of Control Point "Smothers" (MP 212), NS Danville District.
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4639547