Recovery of two steam engines
Day two: Preparation for the roll out of the E2s. As there is no switch, the rails have to be bend around to match the depot track.
Date:
6/17/2016
Location:
Litsn, SE
Views:
137
Collection Of:
Peider SwissTrip
Author:
Peider SwissTrip
Picture Categories:
This picture is part of album:
Steam adventure in Sweden - too nice to be true
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4551671