A LSI C30-7 leads a U30C as they pull a string of loads under the sparyer at the Tilden Mine load out. |
Date:
7/26/2006 |
Location:
National Mine, MI Map  |
Views:
475 |
Collection Of:

Mike Tabone |
Locomotives: |
Author: Mike Tabone
|
 |
Picture Categories: Yard |
This picture is part of album: Wisconsin Central and LS&I 2006 |