UP 7854 ES44AC (or C45ACCTE per UP) takes a breather while waiting for the signal to push an intermodal train east. General Electric built and delivered this locomotive in March 2008. |
Date:
3/20/2016 |
Location:
Mesquite, TX Map  |
Views:
162 |
Collection Of:

Roberto Alaniz |
Locomotives: |
Author: Roberto Alaniz
|
 |
Picture Categories: Roster,Track,Action |
This picture is part of album: 2016 1Q |