A pair of M-977 HEMTTs secured to TTX 910174 during rail loading at Ft. McCoy, WI, on 17 Jun. '00. An M-984 HEMTT wrecker is partially visible on the left. Variants of 2 1/2- and 5-ton trucks are secured to the other 89' flatcars. TF 632, a battalion-size task force consisting primarily of units from 1-632D AR and 2-127TH IN, WIARNG, was rail loading its equipment for deployment to Gowen Field, ID, for AT ’00. |