In less than a year, you want be able to see this anymore. In June 2016 first the freight train uses the new basic Gotthard tunnel with a length of 57 km / 35 miles. Later the passenger trains are going to use it too. 11254 Re 4/4 and two stable mates are pulling a gravel train up the Gotthard north ramp. |