After SP abandoned their line in 1980; Mo-Pac built a connection to serve this grain facility. Spur was removed sometime after 2005. |
Date:
6/29/2015 |
Location:
Mathis, TX |
Views:
59 |
Collection Of:
Randy Curlin |
|
Author: Randy Curlin
|
|
Picture Categories: Track |
This picture is part of album: More South Texas June 2015 |