GBW 319         
Train 2 crosses the highest point on the GWB main line. After the WC takeover the welded rail was pulled and placed on the ex-FRVR main through Oshkosh.
Date: 8/14/1993 Location: Amherst Junction, WI Views: 356 Collection Of:   Stephen Borleske
Locomotives: GBW 319(C424) GBW 318(RS27) GBW 322(C424)    Author:  Stephen Borleske
GBW 319
Picture Categories: Action This picture is part of album:  August 1993
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4066203