With a 3 hour window before the noon train this MoW crew appeared to do some timber work on the trestle. Amazingly all the work here is manual and there is not a power tool in sight! At the bridge footings however, a series of floodlights were being replaced with LED type floods. At night the bridge is lit up with a 'streaming' display of changing colors. |