NS 66D & PPLX train         
After a nearly 4 hour delay caused by a highway traffic incident at the PA Rt. 54 crossing about 2 miles west of here, NS 66D on the Industrial Track passes an empty PPLX train of aluminum coal gons at PPL's Montour Power Plant. The empty PPLX train, NS 643, would be the first "Ridge" train to operate over the NBER since that line sustained washouts from severe storms on June 27, 2013.
Date: 7/8/2013 Location: Strawberry Ridge, PA Views: 302 Collection Of:   Jim Appleman
Locomotives: NS 9929(C40-9W) NS 9282(C40-9W) NS 6736(SD60I) NS 6721(SD60I)    Author:  Jim Appleman
NS 66D  &   PPLX train
Picture Categories: Scenic,Action This picture is part of album:  NS Watsontown Secondary/Industrial Track
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3548605