120707096 UofM Washington Ave bridge being reinforced to accomodate Central Corridor light rail         
Concrete piers formerly had 3 vertical pillars, 2 more were added to support extra steel span girders. Steel paneling under bridge is temporary construction safety net.
Date: 7/7/2012 Location: Minneapolis, MN Views: 42 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
120707096 UofM Washington Ave bridge being reinforced to accomodate Central Corridor light rail
Picture Categories: Bridge,Transit,Track This picture is part of album:  Twin Cities Streetcars and Trolleys
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3322883