Westbound Control Signal. Leaving the 16.5 mile stretch of double track CTC that began at "Becker", entering the 29 mile stretch of double track ABS/TWC that ends at "Gregory" There is a double crossover and a spur to the yard in St. Cloud. The yard is operated by the Northern Lines RR. they load roack trains and grain shuttles. |
Date:
11/25/2012 |
Location:
Saint Cloud, MN |
Views:
94 |
Collection Of:
Matt Hagfors |
|
Author: Matt Hagfors
|
|
Picture Categories: |
This picture is part of album: Track and Signals in Minnesota. |