Eastbound Control Signal. Leaving the 29 mile stretch of double track ABS/TWC began at "Gregory" Entering the 16.5 mile stretch of double track CTC that ends at "Becker", There is a double crossover and a switch leading to the yard in St.Cloud, seen on the far right. The yard is operated by the Northern Lines RR. they load roack trains and grain shuttles. |