MARC 28
Excursion Causing Delays. I was on the crossing, and it took a good 20 minutes for this thing to unload. I overheard throught the guy on the left that there was a small local behind it that needed to get into the yard. It was a little chaotic.
Date:
10/6/2012
Location:
Brunswick, MD
Views:
286
Collection Of:
Ryan Thomas
Locomotives:
MARC 28(MP36PH-3C)
Author:
Ryan Thomas
Picture Categories:
This picture is part of album:
CSX Metropolitan Subdivision
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=3225660