The new storage track has been pulled to a position parallel with the existing track. The new track has only gauge ties at this time and is awaiting ballast and final installation of cross ties. |
Date:
4/4/2012 |
Location:
Woodland, GA |
Views:
158 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Bernie Feltman |
|
Author: Bernie Feltman
|
![The construction of the new storage track continues as the switch mechanism and switch target have been installed](http://s3.amazonaws.com/rrpa_photos/45809/Woodland%20040412%20017.jpg) |
Picture Categories: Signal,Track |
This picture is part of album: CSX roster/still photos |