After tackling the beginning part of the Hill, they start to tackle the last part of it. A BLE Tunnel motor leads two former DM&IR Tunnel Motors with a loaded limestone train |
Date:
8/16/2008 |
Location:
Proctor, MN Map  |
Views:
559 |
Collection Of:

Eric Bitton |
Locomotives: |
Author: Eric Bitton
|
 |
Picture Categories: Action |
This picture is part of album: Twin Ports Railfanning |