The 1919 built Ce 6/8 II on her "jaunt" during the moving day of the historic equipment at Erstfeld depot. The 126 t three part casing construction developes 2688 kW / 3654 hp and was nicknamed Crocodile. In (1'C)(C'1) wheel arrangement it was used in freight operation on the Gotthard route. |