The culvert is in place for the the backfilling to begin to construct the new Washington Street tunnel over the KCS "Meridian Speedway" in downtown Vicksburg |
Date:
5/8/2011 |
Location:
Vicksburg, MS |
Views:
560 |
Collection Of:
Mick Nussbaum |
|
Author: Mick Nussbaum
|
|
Picture Categories: |
This picture is part of album: Mississippi Train Pics |