The four units worked as a consist to move the grain from the CSX interchange at Pinchard, AL to Enterprise. With not siding to run around, the train set out three units in the feed mill lead and used the four unit to pull the train slowly clear of the switch so the three could couple to the rear and switch the train into the loading shed. |