ICG train NC-6 heads across the 2-mile-long Bonnet Carre Spillway trestle on its way out of the New Orleans area. The train had been held at Skip, about ten miles back, to meet CN-5; and was up to speed by the time its passed here. It is about 17 miles into its 900-mile trip from New Orleans to Chicago. The locomotives were SD20's 2012, 2017 and 2003, with caboose 9472. |