At 22:55 on 12-29-2003 loaded grain train G-SJOLAR9-26 (BNSF 4648, NS 9361, BNSF 1032, 103 loads, 0 empties, 13,789 tons, 6087 feet) failed to stop at the red signal at the west siding switch at Pauls Valley. This trian struck train H-PTRSTL9-28 (BNSF 4349, BNSF 4866, ATSF 609, 22 loads, 45 empties, 4222 tons, 3809 feet) as it was taking siding. This resulted in the derailment of the three locomotives on G-SJOLAR9-26 and four cars (OCPX 62871, DOWX 79567, DOWX 79678, and NATX 82801) on H-PTRSTL9-28. This series of photographs documents the recovery process from first light through the ballasting of the installed track panels late in the evening. The main track was placed back in service at 15:05 on 12-30-2003. This photo shows tank car DOWX 78678 which has just rolled onto its side. Product can be seen leaking out of the top dome. A Hulcher Excavator attempts to block the flow of liquid from the car dome while the sidebooms and a bull dozer move into position to right the car. |