Replaced bridge on CSX         
The retaining wall has been poured and ballast is on and the super elevation has been tamped in place. Put on the walkway and this job is done!
Date: 4/28/2009 Location: Vincennes, IN Views: 216 Collection Of:   Brian Vieck
Author:  Brian Vieck
Replaced bridge on CSX
Picture Categories: This picture is part of album:  Replacing a bridge on CSX
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1697812