The retaining wall has been poured and ballast is on and the super elevation has been tamped in place. Put on the walkway and this job is done! |
Date:
4/28/2009 |
Location:
Vincennes, IN |
Views:
216 |
Collection Of:
Brian Vieck |
|
Author: Brian Vieck
|
|
Picture Categories: |
This picture is part of album: Replacing a bridge on CSX |