Shoving 10 loads of frozen limestone towards the shaker at Shelly Materials. This was a slow process, as the frozen stone wound up in clumps the size of volkswagons and had to be heated before being unloaded. About two hours to each car. |
Date:
11/21/2008 |
Location:
Kent, OH Map  |
Views:
441 |
Collection Of:

Richard Thompson |
Locomotives: |
Author: Richard Thompson
|
 |
Picture Categories: Winter |
This picture is part of album: CSX |