080531021 New concrete north signal foundation is in place at BNSF Northtown CTC 44th crossovers         
Being smack-dab in the middle of recently closed Main 2 required a section of track to be snipped out.
Date: 5/31/2008 Location: Minneapolis, MN Views: 176 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
080531021 New concrete north signal foundation is in place at BNSF Northtown CTC 44th crossovers
Picture Categories: Yard,Signal,Track This picture is part of album:  2008 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1186320