080531021 New concrete north signal foundation is in place at BNSF Northtown CTC 44th crossovers
Being smack-dab in the middle of recently closed Main 2 required a section of track to be snipped out.
Date:
5/31/2008
Location:
Minneapolis, MN
Views:
176
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Yard,Signal,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1186320