080528024 At BNSF Northtown CTC 44th, new crossover switches are installed but linkages not fully hooked up yet
Note what looks like temporary "Pot" signals beyond new crossover. Meanwhile, a section of old Main 2 has been snipped out, perhaps to clear site of new permanent signal bridge?
Date:
5/28/2008
Location:
Minneapolis, MN
Views:
218
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Yard,Signal,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1182022