080430006 Transitional (temporary) track changes begin at BNSF Northtown CTC 35th
St. Paul Sub. main cut and re-attached to new second mainline (reconstructed South Runner). Old South Runner cut and re-attached to Transfer One track
Date:
4/30/2008
Location:
Minneapolis, MN
Views:
244
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Yard,Signal,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1144538