080403006 BNSF Northtown CTC 35th track and signal reconstruction         
New ribbonrail being laid on South Runner, new panel switches being prep'ed in distance
Date: 4/3/2008 Location: Minneapolis, MN Views: 157 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
080403006 BNSF Northtown CTC 35th track and signal reconstruction
Picture Categories: Signal,Track This picture is part of album:  2008 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1111655