ARR 3002 had been on the point of the eb PNWR "Toledo Hauler," but had been disconnected before I could get a photo. You can see that the roof headlights are still on, and PNWR 3002 is directly behind it on Engine Track 1. ARR 3002 had spent two days as the PNWR "Toledo Switcher" before returning to the Toledo Hauler. The morning after this photo, ARR 3002 was placed into service on the PNWR "Westsider." |